Author: Tino Böhler, IT-Journalist
December 14, 2022
The aim of implementing the SAP PM module is to simplify, optimize and digitize the entire process behind maintenance. Then the risk of unplanned machine downtime decreases significantly.
May 30, 2017
In the course of several projects such as "Integrative Information Systems and Modern Order Control with ERP and MES", Haver & Boecker introduced a wide range of Cronetwork modules over time. As a link between leading ERP systems and the machine level, the solution embeds itself in the IT infrastructure. However, it all started with a control station in 1998.